Open Pit Quarry Once on site, T. Luckey Sons Inc. technicians set up a temporary dam to reroute the river flow around the fractures. Once the river had been rerouted a detailed inspection of the main fractures could be performed. The large main fracture was approximately 20 feet long and approximately 3 feet wide. The depth was measured at 10 feet before turning and running under the rock formations and entering a maze of underground fractures and caverns that lead to the discharge point of the leak inside the quarry. Technicians installed injection rods down through the fractures until refusal. A rapid set concrete cap was placed over the fractures and allowed to cure. Expanding polyurethane grout was pumped into the fractures and allowed to flow through the fractures approximately 400 feet before expanding and eventualy filling the fracture back to the bottom of the river bottom fracture. The polyurethane grout was allowed to set overnight before removing the temporary river diversion and restoring river flow. Polyurethane Grout Used: Green Mountain International For more information on this project please call Randall Brooks at 513-353-2544. |